Aurora
  • Home
    • Welcome Video
  • Information
    • After Hours Contacts
    • Balconies
    • Bicycles / Scooters
    • Building Access
    • Building Management Team
    • Car Park
    • Charity
    • Common Property
    • Emergency Procedures
    • Fire Procedures
    • Important Documents
    • Insurance
    • Location of Services
    • Moves in & Out
    • Owners Corporation
    • Pets
    • Renovations
    • Resident Registration
    • Rubbish
    • Security
    • Swimming Pool / Gym / Sauna
    • Water Leaks
  • Rules
    • Owners Corporation
    • Renovations
  • History
  • Contact

Body Corporate Rules

Click on the file to the right if you wish to download the Body Corporate Rules.
Body Corporate Rules
File Size: 1120 kb
File Type: pdf
Download File


​

Renovations

Click on the file to the right if you wish to download the Renovation Guidelines.
aurora_apartment_renovati.pdf
File Size: 120 kb
File Type: pdf
Download File

Renovations within apartments are permitted.
 
Prior to the commencement of renovations, the apartment owner is required to submit all relevant and necessary permits, approvals and consents to the Owners Corporation for approval and no work is to commence until that approval is granted.
 
It is the responsibility of the person authorizing the works to ensure that the amenity of other residents is not reduced by the works needed to complete the renovation.
 
The Owners Corporation must approve any work to apartment walls, floors and ceilings that may change the characteristics of those surfaces in a way that may affect the rights of neighbours.
 
In particular, owners should carefully consider the possibility of any change to noise insulating properties, especially as the result of installation of hard flooring.
 
The Owners Corporation may require any renovation to be modified or reversed if it receives complaints of increased noise or other problems caused by a renovation.
 
If you are considering a renovation that may affect the amenity of your neighbours, please seek further information from the Building Manager.
 
Tradesmen doing work inside apartments are required to move large tools and materials through the loading bay not through the front door or through carpark lift lobbies.
 
Any activity that transmits noise beyond an apartment (power tools, hammering, etc) is only allowed between 8:00 am and 5:00 pm on weekdays (not on weekends at any time).
 
Emergency repairs are permitted at any time.

If you want to make a renovation to your apartment please sumbit the details to Body Corporate Services. After you have approval, please print and sign this form and give it to the concierge at the front desk. 

Please contact the Building Manager to receive a more detailed explanation of renovation requirements.
​
Your browser does not support viewing this document. Click here to download the document.
Aurora Apartments

582 St Kilda Rd, Melbourne Vic, 3004
 M: 0425 768 822 

Building Management Team

[email protected]
 
Monday to Friday: 7 am – 7pm, Saturday: 8am – 4pm 
  • Home
    • Welcome Video
  • Information
    • After Hours Contacts
    • Balconies
    • Bicycles / Scooters
    • Building Access
    • Building Management Team
    • Car Park
    • Charity
    • Common Property
    • Emergency Procedures
    • Fire Procedures
    • Important Documents
    • Insurance
    • Location of Services
    • Moves in & Out
    • Owners Corporation
    • Pets
    • Renovations
    • Resident Registration
    • Rubbish
    • Security
    • Swimming Pool / Gym / Sauna
    • Water Leaks
  • Rules
    • Owners Corporation
    • Renovations
  • History
  • Contact